Notes
Clean Rail
Governor Change
Take scaffold out
Fit cable tray for cable from motor
CAR
Fit wall with main COP
Top car wiring
Light Rail
side 1
side 2
box wiring side 1
box wiring side 2
fit door operator 1
fit door operator 2
Checked
Shoes shims
Assemble car frame
Fit the floor
Fit the sill
Level up the car floor
Cut the ropes
Survey the Car
Wiring
Door
Fit the brackets
Assemble the doors
Fit the panels
fit the buttons
SHAFT
Drop travelling cable
Connect the ropes
Top Doors Wiring
Pit Wiring
Over travel switch
Prepera Material close to shaft
CONTROL PANEL
Wiring Shaft wiring
PICTURES Tune the motor drawing used for tunning
DOORS
Fit the bottom panel
Fit the toe guards
Wiring
Pit
Stop Button
Wiring
HOURS
GABRIEL
20 January 2024 - Thursday 07:00 - 17:00 00h/00h
HENRIQUE
20 January 2024 - Thursday 07:00 - 17:00 00h/00h
total 7 days 40h
DRAWINGS
PDF
FIRST JOBS
Builder name: JASON and number: 0423 488 130
Permanent power: GEORGE ELECTRICIAN
rubish beam
FFl
SHAFT
Assemble Scaffold
Set up place with table and organise the stuffs
bracket preparation
installation of brackets
rail clean
Magnetics distribuition
Travelling cable change the side
overtravel switch
BRACKETS/RAILS
Pin brackets - 22/05/24
File the joint
CAR
CUT ROPES
Level up the car
Check the ropes measure
assemble the car
take the plastic from conners
CONTROL PANEL
Tie up the wiring
DOORS
FIT THE DOORS
Fit the doors handle
Wiring the door - 22/05/24
PIT
Check the pins
SHAFT
Magnetics distribuition
Travelling cable change the side
overtravel switch
BUILDER
Shotton contact
Jonathan McAllister - 0481164288 - jonathan@shottonlifts.com.au
Harry Salazar Shotton Lifts - 0461573500
Phill - 0447697343
BBC (Builder commision lift)
Get his Name & Number
builders name
builder number
Finish floor level
Check the height of the door
Rubish place
Permanent Power
Useful Links
Manual
PDF
BCC
FFl
Email with job description